Documents
Every document sent on the project, grouped into one entry per document with all its versions. The newest version is the current one; earlier versions stay visible so nobody works from a superseded copy.
Documents44
With more than one version1
Signature lines still blank2
Filename only (not read)1
- ContractCCDC 2 Stipulated Price ContractNorthstar Construction · $3,480,000.001 versionCurrent5212_CCDC2_signed.pdfNov 18Signature lines:Riverside Community Association · Nov 18Northstar Construction · Nov 18
Contract price $3,480,000 before GST.
How versions are grouped
Copies with the same document number, or the same name apart from dates and revision marks, are treated as one document. If two are grouped wrongly, that's a suggestion to correct, not a fact.